IHostTaskManager::SwitchToTask Method
Notifies the host that it should switch out the current task.
Syntax
HRESULT SwitchToTask (
[in] DWORD option
);
Parameters
option
[in] One of the WAIT_OPTION enumeration values, indicating the action the host should take if the requested operation blocks.
Return Value
HRESULT | Description |
---|---|
S_OK | SwitchToTask returned successfully. |
HOST_E_CLRNOTAVAILABLE | The common language runtime (CLR) has not been loaded into a process, or the CLR is in a state in which it cannot run managed code or process the call successfully. |
HOST_E_TIMEOUT | The call timed out. |
HOST_E_NOT_OWNER | The caller does not own the lock. |
HOST_E_ABANDONED | An event was canceled while a blocked thread or fiber was waiting on it. |
E_FAIL | An unknown catastrophic failure occurred. When a method returns E_FAIL, the CLR is no longer usable within the process. Subsequent calls to hosting methods return HOST_E_CLRNOTAVAILABLE. |
Remarks
The host can switch in another task as desired or needed.
Note
SwitchToTask
does not specify which task the host should switch to; it specifies only the task that it should switch from.
Requirements
Platforms: See System Requirements.
Header: MSCorEE.h
Library: Included as a resource in MSCorEE.dll
.NET Framework Versions: Available since 2.0
See also
Collaborate with us on GitHub
The source for this content can be found on GitHub, where you can also create and review issues and pull requests. For more information, see our contributor guide.