Move Time Field, Machine Center Table

Specifies the move time required for a production lot on this machine. The move time is the time that a lot spends in transit from the previous operation to the current operation at this machine center.

The move time always refers to the time unit of measure entered in the Move Time Unit of Meas. Code field.

The program transfers the move time to the Routing Line table when you enter the number of the machine center into the No. field of the Routing Line table. The move time is used as default to the routing line. You can change it if you want to.

You can enter a decimal value in this field.

Tip

For more information on how to work with fields and columns, see Work with Data. For assistance in finding specific pages, see Search.

Parent Tables

Table Location
No. Series Field, Machine Center Table Manufacturing
Machine Center Table Manufacturing
Machine Center Table Manufacturing

See Also

Reference

Machine Center Card
Move Time