Sequence No. (Forward) Field, Prod. Order Routing Line Table

Specifies the sequence number (forward).

It is possible to plan a production order by forward and backward calculation. Depending on the planning, sequence numbers are assigned. Here the sequence number is entered which this operation has in the forward planning.

Example:

OP1

OP2

OP3

OP4

OP5

OP6

1

2

3

4

5

6

*OP stands for operation - the numbers in the line below correspond to the sequence number in the forward calculation.

To see the difference between forward and backward calculation in the range of sequence numbers, click here.

Tip

For more information on how to work with fields and columns, see Work with Data. For assistance in finding specific pages, see Search.

Parent Tables

Table Location
Prod. Order Routing Line Table Manufacturing
Prod. Order Routing Line Table Manufacturing

See Also

Reference

Routing