Phase 3: Deploy Lync Server 2010 Pilot Stack (Office Communications Server 2007)

 

Topic Last Modified: 2010-12-08

This section describes the reference topology covered in this document. It also covers the steps required to set up a pilot stack deployment of Lync Server 2010, and a few key validation steps to ensure the two pools are coexisting.