Setting the Active Configuration for a Project

  1. Choose Workspace from the View menu.

  2. Choose the FeatureView tab on the Workspace window.

  3. Choose Set Active Configuration from the Build menu, and then select a configuration.

    – or –

    Select a configuration in the Select Active Configuration list on the Build toolbar.

    To view the Build toolbar, point to a blank area on the menu bar, right-click, and then choose Build.

See Also

Project Management | How to Decrease Run-Time Image Size on a CEPC

 Last updated on Friday, October 08, 2004

© 1992-2003 Microsoft Corporation. All rights reserved.